20.5.2. Four-cylinder petrol engines with system of injection of fuel

Models with a connecting level

Adjustment of length of a cable of management of pressure by change of length of a connecting level on 4-cylinder petrol engines with system of injection of fuel

A – connecting level;

B – screw


PERFORMANCE ORDER
1. Remove the air filter.
2. Weaken the screw fixing two parts of a connecting level of a cable of management of pressure (see rice. Adjustment of length of a cable of management of pressure by change of length of a connecting level on 4-cylinder petrol engines with system of injection of fuel).
3. Move apart both parts of a connecting level at the maximum length, then shift them before emergence of notable resistance and enshrine in this provision by the screw.
4. Install the air filter.

Models with the index and an adjusting wheel

Adjustment of length of a cable of management of pressure of rotation of an adjusting wheel on 4-cylinder petrol engines with system of injection of fuel

A – adjusting wheel;

B – regulator plug


PERFORMANCE ORDER
1. Rotating a regulator wheel, install the regulator in such situation that the gap between a tip of a cable and the plug of the regulator made 1 mm.
2. Turn a regulator wheel in the opposite direction before combination of the index of the regulator with a flute in the center of a wheel (see rice. Adjustment of length of a cable of management of pressure of rotation of an adjusting wheel on 4-cylinder petrol engines with system of injection of fuel).