4.7. Pulley of a bent shaft / quencher of tortional fluctuations and nave

PULLEY OF THE BENT SHAFT / QUENCHER OF TORTIONAL FLUCTUATIONS

Removal

PERFORMANCE ORDER
1. Remove a weight wire from the accumulator.
2. In the presence remove the lower mudguard of the engine.
3. Remove a radiator and a krylchatka of the fan.
4. Weaken bolts of fastening of a pulley of the fan of a radiator and take off an auxiliary driving belt.
5. Unscrew bolts and remove a radiator fan pulley.
6. Unscrew bolts of fastening and remove a pulley of a bent shaft / a quencher of tortional fluctuations from a nave.

Installation

PERFORMANCE ORDER
1. Installation is made in the sequence, the return to removal.

NAVE


Prevention

For removal of a nave from a bent shaft it is necessary to use a stripper.

When tightening a bolt of fastening of a nave it is necessary to use a dynamometer key, I provide the shchy moment of tightening of 300 N/m.


Removal

PERFORMANCE ORDER
1. Remove a pulley of a bent shaft / a quencher of tortional fluctuations from a nave.
2. Record a nave from a provorachivaniye. For this purpose manufacture the special tool of two steel strips connected by a bolt. Fix by bolts the special tool on a nave.
3. Unscrew a bolt of fastening of a nave and remove it together with dish-shaped washers.
4. Using a stripper, remove a nave from a bent shaft.
5. In the presence remove a segment spline from a bent shaft.

Installation

Arrangement of dish-shaped washers on a bolt of fastening of a nave of a pulley of a bent shaft

PERFORMANCE ORDER
1. Establish a segment spline in a groove of a bent shaft.
2. For simplification of installation of a nave heat it to temperature of 50 °C.
3. Combine a groove in a nave with a segment spline and establish a nave on a bent shaft.
4. Oil dish-shaped washers pure engine, then establish them by the convex party to a head of a bolt of fastening of a nave (see the drawing).
5. Apply a thin film of engine oil on a carving of a bolt and screw in a bolt of fastening of a nave.
6. Using the special or manufactured independently tool, block a nave from a provorachivaniye and tighten a bolt of fastening of a nave the required moment.
7. Establish a pulley of a bent shaft / a quencher of tortional fluctuations.